Solar Glossary
STRUCTURES & INSTALLATION

MMS (Module Mounting Structure)

The module mounting structure is the steel or aluminium framework that fixes panels to the roof or ground at the design tilt. Structure quality decides whether a plant survives 25 years of wind and monsoon.

Indian practice uses hot-dip galvanised steel (IS 4759, 80+ micron coating) or marine-grade aluminium, designed for site wind speed per IS 875. Elevated RCC-roof structures preserve terrace use and enable bifacial gain.

In More Depth

Two ratings are often confused: the structure’s wind rating (km/h, designed to IS 875 Part 3) and the panel’s own mechanical load rating (Pascals). They are separate checks — see rooftop solar structural safety and wind loading for how to read both, and why anchoring is usually the weakest link.

Galvanised steel versus aluminium is the main material choice: steel is cheaper but depends on coating thickness, while aluminium costs more and resists corrosion — compare them in GI vs aluminium structures.

Frequently Asked Questions

What does MMS stand for in solar?
MMS stands for module mounting structure — the frame that holds solar modules at the right tilt on a roof or on the ground.
How thick should the galvanising on a solar structure be?
Indian practice calls for hot-dip galvanising of about 80 microns (IS 4759). A thin or uneven coating is a common corner-cut that shows up as corrosion after a few monsoons.

Part of the HUM Solar Glossary — 75+ plain-language definitions for India’s solar ecosystem, maintained as a neutral reference. Browse all terms →

Found this useful? Send it to someone planning solar.