Solar Glossary
POLICY & SUBSIDY

PM Surya Ghar: Muft Bijli Yojana

PM Surya Ghar is the Government of India’s flagship residential rooftop solar scheme, launched in February 2024 with a target of one crore solar homes. It provides central subsidy of ₹30,000/kW for the first 2 kW and ₹18,000 for the third — up to ₹78,000.

Applications flow through the national portal to your DISCOM; the subsidy is paid directly to your bank account after commissioning and inspection. Systems must use ALMM-listed, DCR modules installed by registered vendors.

In More Depth

The scheme was approved in February 2024 with an outlay of ₹75,021 crore, targeting rooftop solar on one crore households, and is currently scheduled to run to FY 2026-27 (31 March 2027). Our PM Surya Ghar deadline brief tracks whether that window changes.

Who can apply: an Indian household that owns a house with a roof suitable for solar, has a valid electricity connection, and has not already availed a subsidy for rooftop solar. Subsidy: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW — a maximum of ₹78,000 for 3 kW and above — paid to your bank account after commissioning. Many states add a top-up; see subsidy by state.

How it works: you register on the national portal (pmsuryaghar.gov.in) with your consumer number and mobile number and apply for a rooftop system. Your DISCOM checks technical feasibility; a registered vendor installs the plant; you submit the plant details and apply for net metering; and once the DISCOM inspects and commissions the system, the subsidy is credited — typically within about 30 days. The step-by-step version is in our complete PM Surya Ghar guide.

The rule that trips people up is DCR: subsidised systems must use modules with domestically manufactured cells and modules, so confirm the exact model is on the current ALMM list before you sign — see DCR vs non-DCR panels.

Frequently Asked Questions

How much subsidy does PM Surya Ghar give?
Up to ₹78,000: ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capped at 3 kW. Systems larger than 3 kW receive no additional central subsidy. Some states add their own top-up on top.
What is the last date for PM Surya Ghar?
The scheme is scheduled to run to the end of FY 2026-27, i.e. 31 March 2027. As of October 2026 we have found no official extension, so plan around that date and confirm on pmsuryaghar.gov.in.
Can housing societies use PM Surya Ghar?
Yes, for common facilities: resident welfare associations and group housing societies receive central assistance of ₹18,000 per kW for common-area systems, up to 500 kW. Confirm the current terms on the national portal.
The complete PM Surya Ghar guide

Part of the HUM Solar Glossary — 75+ plain-language definitions for India’s solar ecosystem, maintained as a neutral reference. Browse all terms →

Found this useful? Send it to someone planning solar.