All states & UTs
PM SURYA GHAR · STATE GUIDE

Rooftop Solar Subsidy in Delhi

What residential consumers in Delhi can claim under PM Surya Ghar, how the application flows through your DISCOM, and what a rooftop system will actually generate at your latitude.

5 h

avg. peak sun hours / day

~119

units / kW / month

₹78,000

max central subsidy (3 kW+)

Price after subsidy in Delhi: 1 kW · 2 kW · 3 kW · 5 kW · 10 kW

PM Surya Ghar subsidy window: 31 March 2027

The ₹78,000 central residential subsidy is sanctioned through the end of FY 2026-27 (31 March 2027). Apply and get commissioned well before this date. No extension has been officially notified; MNRE has indicated the one-crore-household target may fall short by March 2027, which makes an extension plausible but not assured — plan around the published date.

As of October 2026 — confirm the current position on pmsuryaghar.gov.in.

Central Subsidy Structure (National)

The PM Surya Ghar: Muft Bijli Yojana subsidy is uniform across India, including Delhi. It is credited directly to the applicant’s bank account after commissioning and inspection.

System capacityCentral assistance
First 2 kW₹30,000 per kW
Third kW₹18,000 per kW
Above 3 kWNo additional central subsidy (max ₹78,000)

Delhi State Subsidy — On Top of the Central Amount

Delhi adds

₹10,000/kW (up to ₹30,000) + generation incentive

Delhi adds a state capital subsidy of ₹10,000 per kW, capped at ₹30,000 for a residential system, on top of the central PM Surya Ghar subsidy — approved by the Delhi Cabinet in May 2025. Combined with the central ₹78,000, a 3 kW home can receive up to ₹1,08,000. Separately, a Generation-Based Incentive (GBI) under the Delhi Solar Energy Policy pays a per-unit amount for five years — reported at ₹3 per unit for systems up to 3 kW and ₹2–2.5 per unit for 3–10 kW (sources differ on the larger band) — rewarding actual generation rather than just installation. Apply through the Delhi solar portal; the state subsidy follows net-meter installation.

Delhi rewards generation, not just installation — a well-oriented, well-maintained system earns more here than a neglected one.

Reported: zero-upfront rooftop solar for eligible households (Sept 2026)

News reports from 1 September 2026 say Delhi will install rooftop solar of up to 3 kW at zero upfront cost for households with average consumption up to 400 units a month, subject to technical feasibility, with the Delhi government adding a capital subsidy equal to the central ₹78,000 and covering the remaining cost gap (including the earlier generation incentive), five years of maintenance, and a target of about 2.3 lakh households by March 2027. Reports on how it works — including a utility-led aggregation model with a vendor assigned by the DISCOM, a choice of 2 kW or 3 kW, and first-come-first-served registration on the Delhi Solar Portal — come from news coverage, not from Delhi’s own published rules, and the reports differ in detail. Our calculators and price pages use the standard route (central subsidy plus ₹10,000/kW up to ₹30,000) and do not assume this scheme; if you qualify it may leave you paying far less upfront, so check the Delhi Solar Portal and your DISCOM first.

Checked October 2026 (moderate confidence). Sources: The Tribune, 1 Sept 2026 · The News Mill, Sept 2026 · Down To Earth, May 2025 (state top-up) · Saur Energy (Delhi top-up, Aug–Sept 2026) · Delhi Solar Portal

Delhi Solar Portal / EEREM Centre

Subsidy information verified October 2026. Schemes and amounts change frequently — always confirm with the official state portal or your DISCOM before making a purchase decision.

Electricity Distribution Companies in Delhi

Your rooftop application is processed by the DISCOM that serves your connection. In Delhi, the principal distribution companies are:

BRPLBYPLTPDDLNDMC

What Will a System Generate in Delhi?

At Delhi’s typical solar resource of ~5 peak sun hours per day and a realistic 78% performance ratio, each kW of rooftop solar produces about 119 units/month (1,424 units/year). A common 3 kW residential system therefore generates roughly 357 units/month — compare that against your electricity bill to gauge coverage.

How to Apply from Delhi

  1. 1Register on the national portal (pmsuryaghar.gov.in) with your electricity consumer number and DISCOM details.
  2. 2Submit the online application; the DISCOM reviews technical feasibility for your connection.
  3. 3After feasibility approval, install the system through any registered vendor of your choice.
  4. 4Apply for net metering; the DISCOM inspects the plant and installs the net meter.
  5. 5Submit the commissioning report and bank details — the central subsidy is credited directly to your account, typically within 30 days.

Frequently Asked Questions

How Much Solar Subsidy Can I Get in Delhi?
Beyond the national PM Surya Ghar subsidy (up to ₹78,000 for a 3 kW+ system), Delhi offers an additional state incentive: ₹10,000/kW (up to ₹30,000) + generation incentive. Delhi adds a state capital subsidy of ₹10,000 per kW, capped at ₹30,000 for a residential system, on top of the central PM Surya Ghar subsidy — approved by the Delhi Cabinet in May 2025. Combined with the central ₹78,000, a 3 kW home can receive up to ₹1,08,000. Separately, a Generation-Based Incentive (GBI) under the Delhi Solar Energy Policy pays a per-unit amount for five years — reported at ₹3 per unit for systems up to 3 kW and ₹2–2.5 per unit for 3–10 kW (sources differ on the larger band) — rewarding actual generation rather than just installation. Apply through the Delhi solar portal; the state subsidy follows net-meter installation. As state schemes change, confirm the current figure with Delhi Solar Portal / EEREM Centre before budgeting (verified October 2026).
How Much Electricity Will 1 kW of Solar Generate in Delhi?
At roughly 5 peak sun hours per day and a typical 78% performance ratio, expect about 119 units per month (≈ 1,424 units per year) per kW of installed capacity.
What Is the Last Date to Apply for Solar Subsidy in Delhi?
The central PM Surya Ghar subsidy is sanctioned through 31 March 2027 (as of October 2026); no extension had been officially notified, so apply and get commissioned well before then. The Delhi state top-up runs under its own state rules and may have a different window — confirm with Delhi Solar Portal / EEREM Centre. Check pmsuryaghar.gov.in for the current position.
Which DISCOM Handles Rooftop Solar Applications in Delhi?
BRPL, BYPL, TPDDL, NDMC. Applications route through the national PM Surya Ghar portal, which forwards them to your DISCOM for feasibility approval and net metering.

Solar Subsidy in Other North India States

Found this useful? Send it to someone planning solar.